Thames Water is spending 拢2.3bn on infrastructure improvements through the current AMP7 period (2020-2025). 聽
Civil engineering and infrastructure specialist Barhale will continue to operate under FA1488 covering Lot 1, the non-infrastructure framework, and Lot 2, the infrastructure framework.
Thames Water has also confirmed the extension of Barhale鈥檚 appointment to FA1495 鈥 Lot 5 of the AMP7 framework 鈥 covering the delivery of the water and wastewater AMP7 infrastructure programme across north London.
Activities will include the new installation and replacement of existing trunk and rising mains; pressure management; the inspection of aqueducts, bridges and tunnels; the rehabilitation of sewers, pumping station refurbishment and gravity solutions to maintain asset health and accommodate growth. The programme will also continue work on SUDs and pipeline-related emergency works.
Shane Gorman, Barhale鈥檚 southern region water director, said: 鈥淲ater infrastructure across London and the southeast presents some unique challenges 鈥 not least responding to the huge demand from the country鈥檚 most dense population.鈥
Got a story? Email news@theconstructionindex.co.uk